India Report
Welcome Guest Login | Sign Up | My News | Business Pentatonic
Choose Themes
BREAKING NEWS  
Narrow escape for students as lightening strikes Jammu school            India lose Nagpur test            Widespread rains across Punjab, Haryana; mercury rises            Students go on rampage against pvt coaching centres in Patna            One killed, six injured in landslides           
Featured Articles

Heritage Nilgiris Mountain Rail to get a facelift

Published:
 Feedback  Sign in to Email  Print  Discussion

Chennai
The UNESCO acclaimed World Heritage Nilgiris Mountain Railway (NMR), whose train featured in the famous'Chhaiyaa, Chhaiyaa' song, is all set to get the much-needed facelift.

The metre-gauge train, which chugs through the beautiful terrain of the Nilgiris mountains and has won the hearts of local and foreign tourists for over a century, requires extensive repairs.

The Mettupalayam Coonoor section of the mountain railway was thrown open to public on June 15, 1899 and the line was extended to Udhagamandalam in 1908. Southern Railway (SR) has chalked out a two pronged approach to address both track and locomotive issues for the 46.61 km long metre gauge rail line.

"We intend to complete track renewal for close to 17 kms of track which have been identified out of the total section, along with reconditioning of steel sleepers,"SR Spokesperson Neenu Ittyerah told media.

She said tenders would be floated very shortly to choose the contractors for the facelift works of the track."New rack chairs, which are an integral part of this specialised track structure, are being manufactured in our own workshops," she said.

However, the railway official said there would not be any additional coaches or any modification to the train on the route.

Southern Railway officials said since there had been disruption in services on the NMR recently, the Railway has already sanctioned four new steam locomotives, which were being manufactured at the Golden Rock Workshop.

However, the first of these locomotives would be available after a year or so." Until such time, special efforts have been made to improve the stock of critical spares and to ensure the highest quality of the same. Already two locomotives with oil fired systems have been inducted into the circuit. These have performed well and it is proposed to convert more locos in a similar fashion," officials added.

Southern Railway runs four pairs of trains per day on the Nilgiris Mountain Railway, of which one pair runs between Mettupalayam and Udhagamandalam and three pairs of trains are operated between Coonoor and Udhagamandalam.

Source:
 
 
Share this Bookmark to: Webnews Bookmark to: Bookmarks.at Bookmark to: Folkd Bookmark to: Digg Bookmark to: Facebook Bookmark to: Reddit Bookmark to: Jumptags Bookmark to: Slashdot Bookmark to: Propeller Bookmark to: Furl Bookmark to: Yahoo Bookmark to: Spurl Bookmark to: Google Bookmark to: Blinklist Bookmark to: Technorati Bookmark to: Blinkbits Bookmark to: Smarking Bookmark to: Netvouz Information
*User Name
Note: All fields marked with*are mandatory.
*Password
*Security Image
Comments
  
Total Comments
FEATURED ARTICLES